Public buildings Core of function problems
one Public buildings The core problem in the function problem of:
The pedestrian evacuation space in the functional zone forms the connection of the outdoor environment.
2. Secondary issues in the function of public buildings:
The size, shape, orientation, heat supply, ventilation, sunshine, daylighting, lighting, etc. of the space.
3. Use nature and composition type of public building space:
Main use part, secondary use part, traffic connection part
Summary: between the use part and the auxiliary part of the space, between the main use part and the secondary use part, between the auxiliary part and the auxiliary part, between upstairs and downstairs, between indoor and outdoor, etc. Are inseparable from the transportation part. General entrances and exits, passageways, hallways, gateways, stairs, elevators, escalators, etc. are called traffic contact spaces of buildings.
4. Traffic connection part of public buildings:
Horizontal traffic and vertical traffic hub.
5. The horizontal traffic in the space combination can be divided into the following situations according to the nature of use:
1) Basically, it belongs to the corridor, hall and corridor of traffic connection. Such as the walkways of hotels, offices and other buildings and the safe passages in cinemas;
2) It is mainly used as a corridor, hall or corridor for transportation and other functions. For example, the wide aisle in the outpatient department of the hospital, the aisle or hall in the primary school;
3) Public buildings Aisles and halls for comprehensive use of various functions. Such as the corridor of the exhibition hall and other buildings, and the porch of garden buildings.